User Tools

Site Tools


geothermal_power_plant

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
geothermal_power_plant [2025/12/16 06:36] – [Look and Feel] admingeothermal_power_plant [2025/12/16 06:43] (current) – [Roles and Responsibilities] admin
Line 26: Line 26:
 ===== Building Structure ===== ===== Building Structure =====
  
-**Heat Extraction Wing**+**Perimeter & Exterior Systems** 
 + 
 +  * Steam Yard:Open-air container cluster with exposed pipes, pressure buffers, and vent stacks. Constant steam discharge creates dense fog banks in cold conditions. 
 +  * Maintenance Walkways: Wooden and steel catwalks connecting turbine housing, valve clusters, and inspection points. 
 +  * Guard Post: Reinforced container at the main gate, housing a [[guarding_bots|Guarding Bot]] and checkpoint controls. 
 + 
 +**Heat Extraction Wing (Container Block A)**
  
   * Houses wellheads, pressure regulators, and primary steam collectors   * Houses wellheads, pressure regulators, and primary steam collectors
   * Oversized surge tanks buffer pressure spikes   * Oversized surge tanks buffer pressure spikes
  
-**Turbine Hall**+**Turbine Hall (Container Block B)**
  
   * Three tandem turbines rated at 7 MW each   * Three tandem turbines rated at 7 MW each
Line 39: Line 45:
   * Analog backup panels and manual overrides for treaty-mandated fail-safe   * Analog backup panels and manual overrides for treaty-mandated fail-safe
  
-**Maintenance Bay**+**Control & Monitoring Center (Container Block C)** 
 + 
 +  * SCADA consoles and analog backup panels. 
 +  * Manual override levers required by treaty-mandated fail-safe regulations. 
 +  * Observation slits and reinforced porthole windows facing the turbine hall. 
 + 
 +**Maintenance Bay (Container Block C)**
  
   * Heavy-duty repair pits beneath turbine shafts   * Heavy-duty repair pits beneath turbine shafts
Line 64: Line 76:
   * **Cleaning Bot (1):** The [[cleaning_bots|Cleaning Bot]] maintains walkway cleanliness and drains   * **Cleaning Bot (1):** The [[cleaning_bots|Cleaning Bot]] maintains walkway cleanliness and drains
   * **Guarding Bot (1):** The Guarding Bot secures the main gate   * **Guarding Bot (1):** The Guarding Bot secures the main gate
 +  * **Combat Drone (1)** The [[combat_drones|Combat Drone]] surveils the perimeter
  
 ===== Public Access & Operations ===== ===== Public Access & Operations =====
Line 72: Line 85:
 ===== Security Measures ===== ===== Security Measures =====
  
-  * **Perimeter Wall:** 3 m volcanic-stone barrier with spike-topped parapet+  * **Perimeter Fence:** 3 m metal fence with spike-topped parapet
   * **Controlled Entry:** Main Gate secured by a Guarding Bot, armed with [[guarding_troopers_stun_gun|Guarding Troopers Stun Gun]] and accompanied by [[combat_drones|Combat Drone]].   * **Controlled Entry:** Main Gate secured by a Guarding Bot, armed with [[guarding_troopers_stun_gun|Guarding Troopers Stun Gun]] and accompanied by [[combat_drones|Combat Drone]].
   * **Regular Patrols:**  A local unit of the [[guarding_troopers|Guarding Troopers]], assigned to Firetown's energy sector; rotate every 6 hours   * **Regular Patrols:**  A local unit of the [[guarding_troopers|Guarding Troopers]], assigned to Firetown's energy sector; rotate every 6 hours
geothermal_power_plant.1765866999.txt.gz · Last modified: 2025/12/16 06:36 by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki