| ====== GEOTHERMAL POWER PLANT ====== | ====== GEOTHERMAL POWER PLANT ====== | ||
| + | {{: | ||
| ===== Overview ===== | ===== Overview ===== | ||
| - | * **Location: | + | * **Location: |
| - | * **Address: | + | * **Address: |
| - | * **Surroundings: | + | * **Surroundings: |
| - | Commissioned in 2626 and financed, built, and operated by the [[trade_guild_of_new_kourou|Trade Guild of New Kourou]] under a contract guaranteeing the [[free_state_of_settlers|Free State of Settlers' | + | |
| + | Commissioned in 2627 and financed, built, and operated by the [[trade_guild_of_new_kourou|Trade Guild of New Kourou]] under a contract guaranteeing the [[free_state_of_settlers|Free State of Settlers' | ||
| ===== History ===== | ===== History ===== | ||
| Line 18: | Line 20: | ||
| ===== Architectural Significance ===== | ===== Architectural Significance ===== | ||
| - | * **Materials: | + | * **Materials: |
| - | * **Design: | + | * **Design: |
| * **Wells & Loops:** Dual‐well extraction system with surge‐buffer tanks and pre-insulated heating ducts | * **Wells & Loops:** Dual‐well extraction system with surge‐buffer tanks and pre-insulated heating ducts | ||
| ===== Building Structure ===== | ===== Building Structure ===== | ||
| - | **Heat Extraction Wing** | + | **Perimeter & Exterior Systems** |
| + | |||
| + | * Steam Yard: | ||
| + | * Maintenance Walkways: Wooden and steel catwalks connecting turbine housing, valve clusters, and inspection points. | ||
| + | * Guard Post: Reinforced container at the main gate, housing a [[guarding_bots|Guarding Bot]] and checkpoint controls. | ||
| + | |||
| + | **Heat Extraction Wing (Container Block A)** | ||
| * Houses wellheads, pressure regulators, and primary steam collectors | * Houses wellheads, pressure regulators, and primary steam collectors | ||
| * Oversized surge tanks buffer pressure spikes | * Oversized surge tanks buffer pressure spikes | ||
| - | **Turbine Hall** | + | **Turbine Hall (Container Block B)** |
| * Three tandem turbines rated at 7 MW each | * Three tandem turbines rated at 7 MW each | ||
| Line 37: | Line 45: | ||
| * Analog backup panels and manual overrides for treaty-mandated fail-safe | * Analog backup panels and manual overrides for treaty-mandated fail-safe | ||
| - | **Maintenance Bay** | + | **Control & Monitoring Center (Container Block C)** |
| + | |||
| + | * SCADA consoles and analog backup panels. | ||
| + | * Manual override levers required by treaty-mandated fail-safe regulations. | ||
| + | * Observation slits and reinforced porthole windows facing the turbine hall. | ||
| + | |||
| + | **Maintenance Bay (Container Block C)** | ||
| * Heavy-duty repair pits beneath turbine shafts | * Heavy-duty repair pits beneath turbine shafts | ||
| Line 47: | Line 61: | ||
| ===== Look and Feel ===== | ===== Look and Feel ===== | ||
| - | A deep, throaty rumble resonates as steam hisses through insulated flues. Corridors glow with sodium‐vine lamps that reflect off wet stone floors slick with condensate. | + | The Geothermal Power Plant never truly rests. |
| + | A deep, constant rumble vibrates through the container walls as superheated steam roars through exposed pipes. Condensation beads on metal surfaces and drips onto black volcanic gravel below, where ice forms and cracks underfoot. Steam clouds billow endlessly, torn apart by icy winds from the Ralar highlands. | ||
| + | |||
| + | Inside, corridors are narrow and metallic, lit by harsh industrial lamps and emergency strips. The air smells of sulfur, wet stone, hot metal, and oil. Control rooms hum with generators and analog consoles, their surfaces worn smooth by gloved hands. Valves hiss, pressure gauges tremble, and warning placards are scratched and half-burned. | ||
| + | |||
| + | Outside the perimeter, the wilderness presses close: frozen ash, volcanic rock, and darkness. The glow of Firetown’s industrial ring is visible only in the distance. Here, heat is survival — and failure would be catastrophic. | ||
| ===== Roles and Responsibilities ===== | ===== Roles and Responsibilities ===== | ||
| - | * **Plant Manager (1):** Coordinates operations and liaises with Firetown’s Contact Person | + | * **Plant Manager (1):** Coordinates operations and liaises with Firetown’s |
| * **Geothermal Engineer (1):** Monitors well integrity and steam flow | * **Geothermal Engineer (1):** Monitors well integrity and steam flow | ||
| * **Turbine Operator (2):** Oversees turbine load and ERN feed coupling | * **Turbine Operator (2):** Oversees turbine load and ERN feed coupling | ||
| Line 57: | Line 76: | ||
| * **Cleaning Bot (1):** The [[cleaning_bots|Cleaning Bot]] maintains walkway cleanliness and drains | * **Cleaning Bot (1):** The [[cleaning_bots|Cleaning Bot]] maintains walkway cleanliness and drains | ||
| * **Guarding Bot (1):** The Guarding Bot secures the main gate | * **Guarding Bot (1):** The Guarding Bot secures the main gate | ||
| + | * **Combat Drone (1)** The [[combat_drones|Combat Drone]] surveils the perimeter | ||
| ===== Public Access & Operations ===== | ===== Public Access & Operations ===== | ||
| * **Access Level:** Restricted — no civilian entry | * **Access Level:** Restricted — no civilian entry | ||
| - | * **Operational Hours: | + | * **Operational Hours:** 24/7 in three shifts |
| ===== Security Measures ===== | ===== Security Measures ===== | ||
| - | * **Perimeter | + | * **Perimeter |
| * **Controlled Entry:** Main Gate secured by a Guarding Bot, armed with [[guarding_troopers_stun_gun|Guarding Troopers Stun Gun]] and accompanied by [[combat_drones|Combat Drone]]. | * **Controlled Entry:** Main Gate secured by a Guarding Bot, armed with [[guarding_troopers_stun_gun|Guarding Troopers Stun Gun]] and accompanied by [[combat_drones|Combat Drone]]. | ||
| * **Regular Patrols: | * **Regular Patrols: | ||
| Line 85: | Line 105: | ||
| ===== Tactical Advice for Dungeon Masters ===== | ===== Tactical Advice for Dungeon Masters ===== | ||
| - | Steam Sabotage | + | * **The Vanishing |
| - | + | ||
| - | Black-out Heist – Rival settlers hire the PCs to disrupt geothermal output long enough to slip unauthorized cargo into the Tier-1 ERN feed lines. | + | |
| ===== Related Pages and Further Information ===== | ===== Related Pages and Further Information ===== | ||
| Line 95: | Line 113: | ||
| * [[ralar|Ralar Volcano]] | * [[ralar|Ralar Volcano]] | ||
| * [[firetown|Firetown]] | * [[firetown|Firetown]] | ||
| + | * [[trade_guild_of_new_kourou|Trade Guild of New Kourou]] | ||
| * [[energy_resources_production_and_supply_in_the_beta_age|Exohuman Energy Production in the Beta Age]] | * [[energy_resources_production_and_supply_in_the_beta_age|Exohuman Energy Production in the Beta Age]] | ||
| - | * [[firetown_tier-1_ern|Firetown Tier-1 Energy Redistribution Node]] | ||
| * [[quantum_fusion_recalibration_station_of_firetown|Firetown Quantum Fusion Recalibration Station]] | * [[quantum_fusion_recalibration_station_of_firetown|Firetown Quantum Fusion Recalibration Station]] | ||
| * [[federal_geothermal_power_plant|Federal Geothermal Power Plant]] (Successor in the [[federal_confederation|Federal Confederation]]) | * [[federal_geothermal_power_plant|Federal Geothermal Power Plant]] (Successor in the [[federal_confederation|Federal Confederation]]) | ||
| + | **Tier 1 Energy Redistribution Nodes** | ||
| + | |||
| + | * [[morningstar_tier-1_ern|Morningstar Tier 1 Energy Redistribution Node]] (Beta Age only) | ||
| + | * [[firetown_tier-1_ern|Firetown Tier 1 Energy Redistribution Node]] | ||
| + | |||
| + | **Tier 2 Energy Redistribution Nodes** | ||
| + | |||
| + | * [[new_kourou_primary_energy_redistribution_node_ern-1|New Kourou Tier 2 Energy Redistribution Node]] | ||
| + | * [[hope_tier_2_trickle_node|Hope Tier 2 Energy Redistribution Node]] | ||
geothermal_power_plant.1750481021.txt.gz · Last modified: 2025/06/21 04:43 by admin