User Tools

Site Tools


geothermal_power_plant

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
geothermal_power_plant [2025/12/16 06:39] – [Building Structure] admingeothermal_power_plant [2025/12/16 06:43] (current) – [Roles and Responsibilities] admin
Line 30: Line 30:
   * Steam Yard:Open-air container cluster with exposed pipes, pressure buffers, and vent stacks. Constant steam discharge creates dense fog banks in cold conditions.   * Steam Yard:Open-air container cluster with exposed pipes, pressure buffers, and vent stacks. Constant steam discharge creates dense fog banks in cold conditions.
   * Maintenance Walkways: Wooden and steel catwalks connecting turbine housing, valve clusters, and inspection points.   * Maintenance Walkways: Wooden and steel catwalks connecting turbine housing, valve clusters, and inspection points.
-  * Guard Post:Reinforced container at the main gate, housing a [[guarding_bots|Guarding Bot]] and checkpoint controls.+  * Guard Post: Reinforced container at the main gate, housing a [[guarding_bots|Guarding Bot]] and checkpoint controls.
  
 **Heat Extraction Wing (Container Block A)** **Heat Extraction Wing (Container Block A)**
Line 44: Line 44:
   * “Situation Room” with cross-linked SCADA consoles   * “Situation Room” with cross-linked SCADA consoles
   * Analog backup panels and manual overrides for treaty-mandated fail-safe   * Analog backup panels and manual overrides for treaty-mandated fail-safe
 +
 +**Control & Monitoring Center (Container Block C)**
 +
 +  * SCADA consoles and analog backup panels.
 +  * Manual override levers required by treaty-mandated fail-safe regulations.
 +  * Observation slits and reinforced porthole windows facing the turbine hall.
  
 **Maintenance Bay (Container Block C)** **Maintenance Bay (Container Block C)**
Line 70: Line 76:
   * **Cleaning Bot (1):** The [[cleaning_bots|Cleaning Bot]] maintains walkway cleanliness and drains   * **Cleaning Bot (1):** The [[cleaning_bots|Cleaning Bot]] maintains walkway cleanliness and drains
   * **Guarding Bot (1):** The Guarding Bot secures the main gate   * **Guarding Bot (1):** The Guarding Bot secures the main gate
 +  * **Combat Drone (1)** The [[combat_drones|Combat Drone]] surveils the perimeter
  
 ===== Public Access & Operations ===== ===== Public Access & Operations =====
Line 78: Line 85:
 ===== Security Measures ===== ===== Security Measures =====
  
-  * **Perimeter Wall:** 3 m volcanic-stone barrier with spike-topped parapet+  * **Perimeter Fence:** 3 m metal fence with spike-topped parapet
   * **Controlled Entry:** Main Gate secured by a Guarding Bot, armed with [[guarding_troopers_stun_gun|Guarding Troopers Stun Gun]] and accompanied by [[combat_drones|Combat Drone]].   * **Controlled Entry:** Main Gate secured by a Guarding Bot, armed with [[guarding_troopers_stun_gun|Guarding Troopers Stun Gun]] and accompanied by [[combat_drones|Combat Drone]].
   * **Regular Patrols:**  A local unit of the [[guarding_troopers|Guarding Troopers]], assigned to Firetown's energy sector; rotate every 6 hours   * **Regular Patrols:**  A local unit of the [[guarding_troopers|Guarding Troopers]], assigned to Firetown's energy sector; rotate every 6 hours
geothermal_power_plant.1765867174.txt.gz · Last modified: 2025/12/16 06:39 by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki