geothermal_power_plant
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| geothermal_power_plant [2025/12/16 06:35] – [Architectural Significance] admin | geothermal_power_plant [2025/12/16 06:43] (current) – [Roles and Responsibilities] admin | ||
|---|---|---|---|
| Line 21: | Line 21: | ||
| * **Materials: | * **Materials: | ||
| - | * **Design: | + | * **Design: |
| * **Wells & Loops:** Dual‐well extraction system with surge‐buffer tanks and pre-insulated heating ducts | * **Wells & Loops:** Dual‐well extraction system with surge‐buffer tanks and pre-insulated heating ducts | ||
| ===== Building Structure ===== | ===== Building Structure ===== | ||
| - | **Heat Extraction Wing** | + | **Perimeter & Exterior Systems** |
| + | |||
| + | * Steam Yard: | ||
| + | * Maintenance Walkways: Wooden and steel catwalks connecting turbine housing, valve clusters, and inspection points. | ||
| + | * Guard Post: Reinforced container at the main gate, housing a [[guarding_bots|Guarding Bot]] and checkpoint controls. | ||
| + | |||
| + | **Heat Extraction Wing (Container Block A)** | ||
| * Houses wellheads, pressure regulators, and primary steam collectors | * Houses wellheads, pressure regulators, and primary steam collectors | ||
| * Oversized surge tanks buffer pressure spikes | * Oversized surge tanks buffer pressure spikes | ||
| - | **Turbine Hall** | + | **Turbine Hall (Container Block B)** |
| * Three tandem turbines rated at 7 MW each | * Three tandem turbines rated at 7 MW each | ||
| Line 39: | Line 45: | ||
| * Analog backup panels and manual overrides for treaty-mandated fail-safe | * Analog backup panels and manual overrides for treaty-mandated fail-safe | ||
| - | **Maintenance Bay** | + | **Control & Monitoring Center (Container Block C)** |
| + | |||
| + | * SCADA consoles and analog backup panels. | ||
| + | * Manual override levers required by treaty-mandated fail-safe regulations. | ||
| + | * Observation slits and reinforced porthole windows facing the turbine hall. | ||
| + | |||
| + | **Maintenance Bay (Container Block C)** | ||
| * Heavy-duty repair pits beneath turbine shafts | * Heavy-duty repair pits beneath turbine shafts | ||
| Line 49: | Line 61: | ||
| ===== Look and Feel ===== | ===== Look and Feel ===== | ||
| - | A deep, throaty | + | The Geothermal Power Plant never truly rests. |
| + | |||
| + | A deep, constant | ||
| + | |||
| + | Inside, corridors are narrow and metallic, lit by harsh industrial | ||
| + | Outside the perimeter, the wilderness presses close: frozen ash, volcanic rock, and darkness. The glow of Firetown’s industrial ring is visible only in the distance. Here, heat is survival — and failure would be catastrophic. | ||
| ===== Roles and Responsibilities ===== | ===== Roles and Responsibilities ===== | ||
| Line 59: | Line 76: | ||
| * **Cleaning Bot (1):** The [[cleaning_bots|Cleaning Bot]] maintains walkway cleanliness and drains | * **Cleaning Bot (1):** The [[cleaning_bots|Cleaning Bot]] maintains walkway cleanliness and drains | ||
| * **Guarding Bot (1):** The Guarding Bot secures the main gate | * **Guarding Bot (1):** The Guarding Bot secures the main gate | ||
| + | * **Combat Drone (1)** The [[combat_drones|Combat Drone]] surveils the perimeter | ||
| ===== Public Access & Operations ===== | ===== Public Access & Operations ===== | ||
| Line 67: | Line 85: | ||
| ===== Security Measures ===== | ===== Security Measures ===== | ||
| - | * **Perimeter | + | * **Perimeter |
| * **Controlled Entry:** Main Gate secured by a Guarding Bot, armed with [[guarding_troopers_stun_gun|Guarding Troopers Stun Gun]] and accompanied by [[combat_drones|Combat Drone]]. | * **Controlled Entry:** Main Gate secured by a Guarding Bot, armed with [[guarding_troopers_stun_gun|Guarding Troopers Stun Gun]] and accompanied by [[combat_drones|Combat Drone]]. | ||
| * **Regular Patrols: | * **Regular Patrols: | ||
geothermal_power_plant.1765866933.txt.gz · Last modified: 2025/12/16 06:35 by admin