new_kourou_primary_energy_redistribution_node_ern-1
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| new_kourou_primary_energy_redistribution_node_ern-1 [2025/07/26 06:11] – [Security Measures] admin | new_kourou_primary_energy_redistribution_node_ern-1 [2025/07/26 06:57] (current) – [Related Pages and Further Information] admin | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| === Races | Technology | Buildings & Infrastructure === | === Races | Technology | Buildings & Infrastructure === | ||
| - | ====== NEW KOUROU | + | ====== NEW KOUROU |
| ===== Overview ===== | ===== Overview ===== | ||
| Line 9: | Line 9: | ||
| * **Surroundings: | * **Surroundings: | ||
| - | The New Kourou Tier-2 ERN forms the low‑flux backbone | + | Commissioned in late 2627, the New Kourou Tier‑2 Trickle Node served as the settlement’s primary trickle‑charge hub for [[quantum_fusion_batteries|Quantum Fusion |
| Post-[[peace_treaty|Peace Treaty]] (2631), it remained a vital micro‑grid node under the [[federal_allotment_agency|Federal Allotment Agency]]. | Post-[[peace_treaty|Peace Treaty]] (2631), it remained a vital micro‑grid node under the [[federal_allotment_agency|Federal Allotment Agency]]. | ||
| + | |||
| ===== Architectural Significance ===== | ===== Architectural Significance ===== | ||
| Line 32: | Line 33: | ||
| **Mezzanine – Renewable Feed Integrations ** | **Mezzanine – Renewable Feed Integrations ** | ||
| - | * Solar | + | * Rooftop |
| **Basement – Support & Cooling Systems ** | **Basement – Support & Cooling Systems ** | ||
| Line 42: | Line 43: | ||
| * **High-Security Perimeter: | * **High-Security Perimeter: | ||
| - | * **Drop-Zone Platform:** Covered loading bay for [[hoos|Hoo]]-drawn courier carts of the [[new_kourou_courier_service|New Kourou Courier Service]] delivering QFBs | + | * **Drop-Zone Platform:** Covered loading bay for [[hoos|Hoo]]-drawn courier carts of the [[new_kourou_courier_service|New Kourou Courier Service]] |
| * **Overflow Solar Array:** Ground‑mounted PV panels feeding auxiliary caps | * **Overflow Solar Array:** Ground‑mounted PV panels feeding auxiliary caps | ||
| * **Stormwater Trenches:** Channel runoff and protect outdoor electronics racks | * **Stormwater Trenches:** Channel runoff and protect outdoor electronics racks | ||
| Line 91: | Line 92: | ||
| ===== Player Interaction Possibilities ===== | ===== Player Interaction Possibilities ===== | ||
| - | **Legal Interactions** | + | === Legal Interactions |
| - | * Deliver | + | * Deliver |
| - | * Assist technicians in stabilizing a temporary energy fluctuation event | + | * Get assigned as staff to the Facility by the Federal Allotment Agency (Gamma Age only) |
| - | * Negotiate priority allocation | + | * Apply for a Charge Engineer apprenticeship under NKRS supervision (Beta Age only) |
| - | **Illegal Interactions** | ||
| - | * Sabotage the energy relay to delay Service Bot deployment across the settlement | + | === Illegal Interactions === |
| - | * Steal stored energy from the intake banks using a bypass module | + | |
| - | * Bribe a Grid Technician to reroute surplus energy to a hidden Service Bot workshop | + | |
| + | * Sabotage surge dampeners to trigger an overpressure event | ||
| + | * Bribe a Guarding Bot’s AI node to smuggle an unregistered QFB onto the rails (Beta Age only) | ||
| + | * Hack control mirrors to mask unauthorized charge cycles (Beta Age only) | ||
| ===== Tactical Advice for Dungeon Masters ===== | ===== Tactical Advice for Dungeon Masters ===== | ||
| Line 111: | Line 112: | ||
| ===== Related Pages and Further Information ===== | ===== Related Pages and Further Information ===== | ||
| - | * [[beta_age|Beta Age]] | + | * [[exohuman_technology_of_the_beta_age|Exohuman Technology of the Beta Age]] |
| - | * [[Free State of Settlers|Free State of Settlers]] | + | * [[energy_resources_production_and_supply_in_the_beta_age|Exohuman Energy Production in the Beta Age]] |
| - | * [[new_kourou|New Kourou]] | + | * [[the_exohuman_energy_resources_on_voi_700_d_in_the_gamma_age|Exohuman Energy Resources in the Gamma Age]] |
| - | *[[exohuman_technology_of_the_beta_age| Exohuman Technology in the Beta Age]] | + | * [[federal_geothermal_power_plant|Federal Geothermal Power Plant]] |
| - | * [[quantum_fusion_batteries|Quantum Fusion Batteries | + | * [[quantum_fusion_batteries|Quantum Fusion Batteries]] |
| * [[quantum_fusion_recalibration_stations_qfrs|Quantum Fusion Recalibration Stations (QFRS)]] | * [[quantum_fusion_recalibration_stations_qfrs|Quantum Fusion Recalibration Stations (QFRS)]] | ||
| - | * [[quantum_fusion_recalibration_station_qfrs_of_new_kourou|New Kourou QFRS]] | ||
| * [[energy_redistribution_nodes_erns|Energy Redistribution Nodes (ERNs)]] | * [[energy_redistribution_nodes_erns|Energy Redistribution Nodes (ERNs)]] | ||
| - | | + | |
| + | **Tier 1 Energy Redistribution Nodes** | ||
| + | |||
| + | | ||
| + | * [[firetown_tier-1_ern|Firetown Tier 1 Energy Redistribution Node]] | ||
| + | |||
| + | **Tier 2 Energy Redistribution Nodes** | ||
| + | |||
| + | * [[new_kourou_primary_energy_redistribution_node_ern-1|New Kourou | ||
| + | * [[hope_tier_2_trickle_node|Hope Tier 2 Trickle Node]] | ||
new_kourou_primary_energy_redistribution_node_ern-1.1753510265.txt.gz · Last modified: 2025/07/26 06:11 by admin