User Tools

Site Tools


federal_weapon_manufactory

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
federal_weapon_manufactory [2025/09/21 03:45] – [Look and Feel] adminfederal_weapon_manufactory [2025/09/21 03:47] (current) – [Architectural Significance] admin
Line 10: Line 10:
  
 ===== Architectural Significance ===== ===== Architectural Significance =====
-  * **Construction Materials:** Timber post-and-beam over volcanic-stone plinth; mycelium-brick infill; forge hearths lined with basalt.  +  * **Construction Materials:** Timber post-and-beam over [[atrana_mountains|Atrana mountain]]-stone plinth (granite/gneiss); mycelium-brick infill; forge hearths lined with refractory fireclay brick.  
   * **Floors:** 1 main production level with a small mezzanine for offices and ledgers.     * **Floors:** 1 main production level with a small mezzanine for offices and ledgers.  
   * **Design Aesthetic:** Secure, cleanable work bays; “hot” metal shop isolated from “quiet” assembly and test rooms; clear sight lines from a central foreman’s gallery.     * **Design Aesthetic:** Secure, cleanable work bays; “hot” metal shop isolated from “quiet” assembly and test rooms; clear sight lines from a central foreman’s gallery.  
federal_weapon_manufactory.1758426353.txt.gz · Last modified: 2025/09/21 03:45 by admin

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki