copper_mine
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| copper_mine [2025/09/25 03:48] – [Overview] admin | copper_mine [2025/12/15 12:59] (current) – [Look and Feel] admin | ||
|---|---|---|---|
| Line 3: | Line 3: | ||
| ====== THE (FEDERAL) COPPER MINE ====== | ====== THE (FEDERAL) COPPER MINE ====== | ||
| + | {{: | ||
| ===== Overview ===== | ===== Overview ===== | ||
| * **Location: | * **Location: | ||
| * **Address: | * **Address: | ||
| - | * **Surroundings: | + | * **Surroundings: |
| - | * **Supply Line by Age:** **Beta Age →** [[Firetown Copper Plant Inc.|Firetown Copper Plant Inc.]] · **Gamma Age →** [[federal_copper_plant|Federal Copper Plant]] | + | * **Supply Line by Age:** Beta Age → [[Firetown Copper Plant Inc.|Firetown Copper Plant Inc.]] · Gamma Age → [[federal_copper_plant|Federal Copper Plant]] |
| - | The (Federal) Copper Mine is the foundational extraction site that supplied raw copper to Firetown’s metallurgical hub across both eras. Conceived by the [[free_state_of_settlers|Free State of Settlers]] as a state-owned enterprise after a [[last_frontier_university|Last Frontier University]] survey (Dec 2625), construction began in April 2626 under [[gaia_system|GAIA]] using [[manual_labor_bots|Manual Labor Bots]] and salvaged [[last_frontier|Last Frontier]] modules; the mine opened on 17 February 2627. In the [[beta_age|Beta Age]] it fed ore to [[Firetown Copper Plant Inc.|Firetown Copper Plant Inc.]]; after nationalization (2632, [[the_gamma_age|Gamma Age]]), output was downscaled to treaty quotas and routed exclusively to the [[federal_copper_plant|Federal Copper Plant]] under [[federal_allotment_agency|Federal Allotment Agency]]/ | + | The (Federal) Copper Mine is the foundational extraction site that supplied raw copper to Firetown’s metallurgical hub across both eras. Conceived by the [[free_state_of_settlers|Free State of Settlers]] as a state-owned enterprise after a [[last_frontier_university|Last Frontier University]] survey (Dec 2625), construction began in April 2626 under [[gaia_system|GAIA]] using [[manual_labor_bots|Manual Labor Bots]] and salvaged [[last_frontier|Last Frontier]] modules; the mine opened on 17 February 2627. In the [[beta_age|Beta Age]] it fed ore to [[Firetown Copper Plant Inc.|Firetown Copper Plant Inc.]]; after nationalization (2632), output was downscaled to treaty quotas and routed exclusively to the [[federal_copper_plant|Federal Copper Plant]] under [[federal_allotment_agency|Federal Allotment Agency]]/ |
| ===== History ===== | ===== History ===== | ||
| Line 72: | Line 73: | ||
| ===== Look and Feel ===== | ===== Look and Feel ===== | ||
| + | |||
| ==== Beta Age ==== | ==== Beta Age ==== | ||
copper_mine.1758772100.txt.gz · Last modified: 2025/09/25 03:48 by admin